Q:How about the charge time for a Chevrolet Volt?
by|Nov 6, 2016
2 Answers
Answer This Question

A:  I have a '12 Volt. It takes less than 4 hours.

by|May 4, 2023

A:  Charging the Volt should take between 3.5-4 hours.

by|May 4, 2023
    caret
    Q:How long will this 40amp charger station take to charge a Tesla S
    by|Oct 23, 2016
    2 Answers
    Answer This Question

    A:  It depends on a couple things: the battery capacity and on-board charger of your Tesla. If you have a 100kWh battery and the on board charger can take full advantage of the 40 amp charger, then it should charge within 10 hours. I have a Chevy Volt that only uses 10kWh of the battery and the internal charger can only do 3.3kW. It takes less than 4 hours for a full charge from zero. I bought the 40A EVSE for future EVs that have bigger internal chargers. Basically you can take battery size and divide by the smaller of EVSE kW or internal charger kW and come up with hours. If you make sure your EVSE has more capacity than your EV internal charger, you should be good.

    by|May 4, 2023

    A:  Charging rate will depend on the vehicle's own charging rate, and battery capacity (this may vary year by year). A 40A unit can typically charge a model S in 5-6 hours, but you can check with Tesla for more accurate charging rates.

    by|May 4, 2023
      caret
      Q:What is the charging time on a 20165 KIA EV Plus?
      by|Jul 5, 2016
      1 Answer
      Answer This Question

      A:  Charging time depends on each vehicles charging rate and battery size, so without those details I can't provide an estimate.

      by|May 3, 2023
        1 found this answer helpful
        caret
        Q:Why don't tell the consumer you need the mounting plate to install the product
        by|Feb 8, 2016
        1 Answer
        Answer This Question

        A:  Thank you for your recent inquiry with The Home Depot, DG. I have forwarded this information over to our online team to have this information updated. We appreciate your business and look forward to serving you in the future. Thank you for shopping Home Depot.

        by|May 3, 2023
        1 found this answer helpful
        caret
        Q:Model listed not correct with hardware specs
        by|Jul 30, 2015
        1 Answer
        Answer This Question

        A:  The EVB40-PST is a surface mount plug-in charging station, but it has the capabilities to be hardwired for outdoor applications by removing the cord end and running conduit straight to the unit. This charging station requires a NEMA 6-50 receptacle on a dedicated circuit.

        by|May 3, 2023
          1 found this answer helpful
          caret
          Q:What size circut and breaker do I need for this EVSE?
          by|Jul 30, 2015
          2 Answers
          Answer This Question

          A:  The EVB40-PST requires a dedicated 50 Amp circuit.

          by|May 3, 2023
            3 found this answer helpful

            A:  50 amps

            by|May 4, 2023
              caret
              Q:What would the approx. charge time be for a Nissan Leaf?
              by|May 5, 2015
              2 Answers
              Answer This Question

              A:  Good day, The EVB40 will fully charge a Nissan Leaf in approximately 7 ½ hours. David Keller, Leviton

              by|May 3, 2023

                A:  Nissan Leaf have a 6.6kW charger and a 30kWh battery - that works out to around 5 hours. YMMV.

                by|May 4, 2023